Site preparation is done and construction has begun on the curtain drain and leach field.

curtain drain 1curtain drain 2

The trench is dug, lined with fabric, the pipe laid down and the trench then filled with stone.

curtain drain 3leach field prep

The fabric is wrapped over the top of the stone and will be covered with dirt. The leach field is tilled up a bit and then covered with sand. There will be more sand added tomorrow but the excavators wanted to get some material on the field since it has been raining quite a bit the last 2 days. This will stabilize things until they lay the pipe tomorrow and finish the mounds.